Hardware requirements – Bloom Manufacturing LS42K Series User Manual

Page 6

Advertising
background image

Section 4

Winch Break In

• Winches, like any other kind of machinery, require a “break in” to perform well and

to maximize their life.

• Use extreme care when first spooling cable onto the winch. Do not run the winch at

high speeds when performing this operation.

• Make sure that the cable is unrolled in a line ( to prevent kinks ) and slowly inhaul

the winch to install the cable.

• Do not exceed one half rated load or one half rated line speed for the first thirty

minutes of operation. This will ensure that the gears have an opportunity to wear
in properly

CAUTION

in properly.

Section 5

Winch Installation

• You must make sure that your winch is securely mounted in order for it to function

properly and to ensure safe operation.

• The mount must be flat to ensure proper alignment between the gearbox side, the

drum, and the end housing.

• With a hydraulically driven winch, make sure the hydraulic system is clean and

that all components function properly, especially the relief valve.

CAUTION

Winch Series

LS30K, LS32K, LS40K & LS42K

Base Mount (steel)

Thickness

1”

8 UNC

8

HARDWARE

REQUIREMENTS

Capscrews (Hexhead)

Size

Thread

Grade (plated)

Torque / Tightening

1.50”

Torque / Tightening

(foot pounds)

682

NOTES:
- Tightening torque above is based on use of clean, dry threads.
- Reduced torque by 10% when oil is used as a lubricant.
- Reduced torque by 20% if new plated capscrews are used.

THINK S-A-F-E-T-Y FIRST Bloom Mfg Inc. 319-827-1139

PAGE 6 OF 8

q

y

p

p

04/2009

Advertising
This manual is related to the following products: