Figure 4 – ADC P-90-216 User Manual

Page 8

Advertising
background image

ADCP-90-216
Issue 2, January 1998

Page 8

1998, ADC Telecommunications, Inc.

4. If applicable, remove the vertical cable guide from each side of the frame position in

which the splice module is being installed.

5. Place the splice module in its assigned position in the frame.

6. Insert two #12-24 screws supplied through the mounting bracket at each side of the

chassis and in the frame as shown in

Figure 4

.

7. Install optional vertical cable guides or reinstall the removed guides (see

Figure 5

).

8. Re-attach the front cover.

1216-A

FRAME

INTERBAY

MANAGEMENT

PANEL

MOUNTING

BRACKET

#12-24 SCREW

(2 PLACES - BOTH SIDES)

Figure 4. Splice Module Installation in an Equipment Rack

Advertising