American Standard Acrylic 6032.STRH User Manual

Page 2

Advertising
background image

©

A S A m e r i c a , I n c . 2 0 0 8

751817-100 Rev. Q

FOR AFTER-SALES SERVICE CALL 1 (800) 442-1902 WEEKDAYS.

CLEANING AND MAINTENANCE

D

C

E

F

G

H

DRAIN
ASSEMBLY

Strainer

Drain

Body

Shower
Base

Silicone
Sealant

Rubber

Gasket

Fiber
Gasket

Locking
Nut

Rubber

Caulking

Gasket

Lift and lower base over center
of drain pipe and set into place

Base Flange

Drywall
Screw

Bracket

Stud

Shower
Base

Shower
Base

Splash
Lip
Flange

Bracket

Tile
Adhesive

Waterproof
Drywall

Tile

Stud

Caulk

Your American Standard shower base is designed to last indefinitely
with reasonable care and maintenance.
The high-gloss acrylic surface is resistant to impact and retains its luster
with proper care and maintenance. An integral, slip-resistant surface is
incorporated for user safety.
General Cleaning: Do not use abrasive cleaners; a mixture of warm
water and a mild liquid detergent is adequate for most cleaning. Strong
detergents formulated for use on tile or porcelain-enamel surfaces
should be avoided.
Caution:
Do not allow liquid detergent containers to remain on base
surfaces for more than a few moments. Do not use Lestoil, Windex, Mr.
Clean, Dow Disinfectant (spray or concentrate), or Lysol Basin, Tub and
Tile Cleaner. Do not allow nail polish remover, dry cleaning fluid, acetone,
paint remover, or other solvents to contact acrylic surface.

Level

Level

Level base in two directions.

51x102 mm

(2x4) Stud Wall

Waterproof

Drywall

13mm (1/2")

minimum

Bedding Material Area

3 mm

(1/8)

127 mm (5)

51 mm (2)
PVC Pipe

159mm

(6-5/8)

Bedding

Material

No Bedding

Under
Apron

Before installing drain into
the shower base, remove
strainer (see Fig. C). This
will be installed after
shower base is in its final
position. Install the drain to
the shower base as shown
in Fig. D. Use silicone
sealant between drain
body and shower base.

Secure the base to the studs as shown, using the
screws and the brackets provided. See Fig. G.
Note: Allow the bedding material to completely
harden before applying weight to the bottom of
the shower base.

Draw a line 6-5/8" (159mm) from the
sub-floor on to the studs at each
side of the opening. Using this line
and a level, mark the remaining
studs. (See Figs. A & B.) This will be
the installed height of the shower
base. Mix the low-shrink bedding
material (grout, mortar, plaster, etc.).
Concrete is not recommended.
Apply enough bedding material to
support the entire bottom of the
shower base. The bedding material
must not be used under the apron
(front edge).

1

SHOWER BASE

3636.NEO
3838.NEO
4242.NEO
3232.ST
4834.ST
6034.ST
3636.ST
4242.ST
4832.ST
6032.STRH/LH*

5/16" ± 1/16"
3/8" ± 1/16"
5/16" ± 1/16"
3/8" ± 1/16"
1/4" ± 1/16"
1/4" ± 1/16"
1/4" ± 1/16"
5/16" ± 1/16"
1/2" ± 1/16"
1/2" ± 1/16"

WASTE PIPE HEIGHT

2

3

4

5

6

A

51 mm (2)

PVC Waste Pipe

127mmx127mm

(5x5) Opening

(See Product Chart for Drain Location)

C/L

C/L

3636.NEO, 3838.NEO, 4242.NEO

90°

90°

6-5/8

6-5/8

Insure the floor and stud walls are square and plumb. Provide a 5" x 5" (127mm x
127mm) opening in the floor for the drain (see Figs. A & B). The drain plug
accom-modates a 2" (51mm) PVC waste pipe. The waste pipe should extend above
the surface of the sub-floor, refer to chart on page 2 for the required dimensions.
See product drawings on this page for the specified drain locations.

B

3232.ST, 3636.ST, 4242ST, 6034.ST, 4834.ST, 4832.ST

90°

90°

51 mm (2)

PVC Waste Pipe

127mmx127mm

(5x5) Opening

C/L

(See Product Chart for Drain Location)

6-5/8

Tape over the strainer to protect the finish
and prevent construction debris from
entering the drain.

Finish installation as shown in Figure H.

After the bedding material has been poured and
before it sets,
lower the shower base into position
with the drain assembly sliding over the waste pipe
as shown in Fig. E. It will be necessary to "rock" the
shower base until the top of the tile flange aligns
with the lines drawn in Step 3 on the stud walls.
Make certain the apron is contacting the rough floor
along the entire length of the shower base. Insure
that the base is level in two directions (see Fig. F).
Snap strainer back into place and check for proper
drainage.

Note: Variations in
levelness of the subfloor
may require adjustment
of waste pipe height.

* For 6032.STRH and
6032.STLH, see drawing
for proper location of
5" x 5" drain cut-out.

Advertising