Prepare the harness wires, Install the battery and power fuses – APC AP9924 User Manual

Page 10

Advertising
background image

Install the Wire Harnesses

8

Wire Harness: Installation

Prepare the harness
wires

To prepare the harness wires:

1. Measure the length of each wire so that it will reach from the

positive terminal on its battery to the battery connector on the rear
of the Battery Management System, adding a ‘service loop’ that
will permit one repair of the wire without having to replace it.

2. For an APC Silcon unit, measure wires to connect to the fuse bus

and midpoint bus located on the inside roof of the battery cabinet.

3. Cut the wires to the lengths measured in step 1 and step 2, and

reattach the wire labels to the wire ends.

4. For an APC Silcon unit, attach the male Faston connectors to the

fuse bus and midpoint bus wire ends, and crimp them securely in
place.

5. Attach the female Faston connectors to the battery wire ends, and

crimp them securely in place.

Install the battery and
power fuses

Attach a 5 A fuse (0W2015) to the following wire connectors:

• Strings A–33A
• Strings 1B–33B, if applicable
• String 35A (negative power wire)

Attach a 3/4 A fuse (0W2237) to String 34A (positive power wire).

See “Determine fuse bus and midpoint bus connections
(Silcon only)” on page 4
.

m

p

h026

1a

Advertising
This manual is related to the following products: