CEMA STANDARD NO: 352-2012

EMERGENCY SHUTDOWN

An emergency shutdown may be necessary to clear obstructions or to replace damaged or worn components.

1.

LOCKOUT/TAGOUT ALL POWER.

2.

Remove all covers.

3.

Remove all obstructions and product from conveyor.

4.

Inspect all components for damage or wear. Check conveyor components in accordance with the Maintenance
Section of this document.

5.

Replace all damaged or worn components. Replace conveyor components in accordance with the Assembly
Section of this document.

6.

Turn drive unit by hand to check for alignment and obstructions.

7.

Replace all covers and guards.

8.

Restart conveyor in accordance with the Operation Section of this document.

EXTENDED SHUTDOWN

An extended shutdown may be necessary if the conveyor is not in operation for a long period of time.

1.

Operate conveyor until all product is removed.

2.

LOCKOUT/TAGOUT ALL POWER.

3.

Remove all covers.

4.

Remove all obstructions and product from conveyor.

5.

Inspect all components for damage or wear. Check conveyor components in accordance with

the Maintenance Section of this document.

6.

Replace all damaged or worn components. Replace conveyor components in accordance with the Assembly

Section of this document.

7.

Lubricate drive and all bearings in accordance with manufacturer’s instructions.

8.

Coat all exposed metal surfaces with rust preventative.

9.

Rotate screws by hand every week. Screws may sag and permanently deform if not rotated.

NOTE: When operation is to resume, restart conveyor in accordance with the Operation Section of this document.

STORAGE

1.

Protect conveyor from weather, moisture and extreme temperatures. DO NOT use coverings that promote
condensation.

2.

Coat all exposed metal surfaces with rust preventative.

3.

Rotate screws by hand every week. Screws may sag and permanently deform if not rotated.

NOTE: When operation is to resume, restart conveyor in accordance with the Operation Section of this document.

SECTION E – SHUTDOWN AND STORAGE