6. INSTALLATION CHECKLIST


BATTERY INSTALLATION

Battery is connected properly.

Recommended battery is installed.

Cables are clean and tight.

Terminals are coated with anti-corrosion grease, and

terminal covers are positioned.

FUEL SYSTEM

Complies with local and NFPA codes.

Fuel is connected and checked for leaks.

Correct fuel pressure (11-14 inches of water (0.6 psi) at

all load ranges).

Load block adjusted for maximum power for natural gas

fuel.

LOCATION

Unit is fastened to the appropriate mounting pad.

Louvers are free from obstruction.

Exhaust is clear of flammable objects and debris.


ELECTRICAL CONNECTIONS

Complies with local code requirements and all National

Electrical Codes.

Utility is connected and present.

Transfer switch is connected.

All wires running outside of the generator are in NEC-

approved conduit. *Note: Utility wires and transfer switch
control wires must be in separate conduit.

Unit is grounded to an approved earth ground.


COOLING AND VENTILATING

All inlets and outlets are free from obstruction.


OTHER

Verify that the unit is filled to the proper level with the

proper break-in oil. Adjust as required.