Inserting the sfp, Positioning the sfp handle in the upright position – Allied Telesis AT-GS950/10PS User Manual

Page 52

Advertising
background image

Chapter 2: Installation

52

4. Slide the transceiver into the SFP slot until it clicks into place. See

Figure 27.

Figure 27. Inserting the SFP

5. Verify that the handle on the transceiver is in the upright position, as

shown in Figure 28. This secures the transceiver and prevents it from
being dislodged from the slot.

Figure 28. Positioning the SFP Handle in the Upright Position

6. Repeat Step 2 through Step 5 to install additional SFP transceivers.

Note
SFP transceivers are dust-sensitive. Always keep the plug in the
optical bores when a fiber optic cable is not installed, or when
storing the SFP. When you do remove the plug, keep it for future
use.

Note
Unnecessary removal and insertion of an SFP can lead to
premature failure.

SFP Transceiver

Handle

Advertising
This manual is related to the following products: