Allied Telesis AT-SBx81CFC960 User Manual

Page 132

Advertising
background image

Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards

132

Section II: Installing the Chassis

Figure 71. Removing the Battery Insulator

5. Move the locking handles on the front panel to the open position, as

shown in Figure 72.

Figure 72. Opening the Locking Handles on the AT-SBx81CFC960

Controller Fabric Card

6. Align the edges of the AT-SBx81CFC960 Controller Fabric Card with

the internal chassis card guides in slot 5 or 6 of the AT-SBx8106
Chassis. Figure 73 on page 133 shows the AT-SBx81CFC960 Card
aligned in slot 5.