Allied Telesis AT-SBx31CFC960 User Manual

Page 150

Advertising
background image

Chapter 8: Installing the Transceivers and Cabling the Ports

150

Figure 92. Labels on SFP and CSFP Transceivers

4. Slide the transceiver into the slot until it clicks into place, as shown in

Figure 93.

Figure 93. Inserting an SFP or a CSFP Transceiver

Note

If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining SFP and CSFP transceivers in the line cards.

5. Remove the protective cover from the ports on the transceiver, as

shown in Figure 94 on page 151.

Label

Advertising
This manual is related to the following products: