AT-GS900/16, AT-GS900/24 Gigabit eco-friendly Ethernet Switch Installation Guide

29

Selecting a Site for the Switch

Observe the following requirements when choosing a site for your switch:

ˆ

If you plan to install the switch in an equipment rack, ensure that the
rack is safely secured and that it will not tip over. Devices in a rack
should be installed starting at the bottom, with the heavier devices
near the bottom of the rack.

ˆ

If you are installing the switch on a table, ensure that the table is level
and secure.

ˆ

The power outlet for the switch should be located near the unit and
should be easily accessible.

ˆ

The site should provide for easy access to the ports on the front of the
switch. This will make it easy for you to connect and disconnect cables,
as well as view the switch’s LEDs.

ˆ

To allow proper cooling of the switch, air flow around the unit and
through its vents on the side and rear should not be restricted.

ˆ

Do not place objects on top of the switch.

ˆ

Do not expose the switch to moisture or water.

ˆ

Ensure that the site is a dust-free environment.

ˆ

You should use dedicated power circuits or power conditioners to
supply reliable electrical power to the network devices.