Chapter2, Installation, Before you begin – Allied Telesis AT-MR840TF User Manual

Page 31: Power requirements, Installing the hub, Making utp port connections, Carefully remove the at-mr840tf hub from its pa, Position the hub in a location with adequate ve, Attach an ac cord to the hub and make sure that, On the hub side, attach your 10base-t utp cable

Advertising
background image

11

Chapter 2

Installation

Before You Begin

Before proceeding with the installation, please read “Electrical Safety and
Installation Requirements” on page iii through xviii

.

Note

Installation of this product should only be performed by TRAINED
SERVICE PERSONNEL.

Power

Requirements

Be sure that the voltage and frequency is either 100-120 or 200-240 VAC and
50 or 60 Hz. Since there is no external power switch, power is applied when the
power cord is connected.

Installing the Hub

Making UTP Port Connections

1. Carefully remove the AT-MR840TF hub from its packaging box. Keep the

packing materials for future use.

2. Position the hub in a location with adequate ventilation and a power

source.

3. Attach an AC cord to the hub and make sure that the POWER LED on the

front panel lights.

4. On the hub side, attach your 10Base-T UTP cables (RJ45 connectors) to the

10Base-T ports.

5. On the workstation side, attach the other end of the UTP cable to the

10Base-T network adapter card on the workstation.

MR840TF_Book Page 11 Tuesday, November 11, 1997 3:46 PM

Advertising