Allied Telesis AR400 Series Router User Manual

Page 97

Advertising
background image

Routing

97

Software Release 2.6.1
C613-02021-00 REV D

To configure IP follow these steps

The following steps are required:

1.

Configure the PPP Link.

2.

Create a VLAN and add untagged ports.

3.

Configure the IP routing module on both routers.

4.

Test the configuration.

5.

Save the configuration.

1.

Configure the PPP Link

Refer to other sections of this guide on how to configure PPP interface 0 on
each router to use the wide area link.

See “Point to Point Protocol (PPP)” on page 80 for information about
configuring PPP to use a synchronous link.

See “Configuring ISDN (AR410 only)” on page 86 for information about
configuring PPP to use an ISDN call.

If the PPP interface is configured for dial-on-demand operation
(see“Configuring ISDN Dial on Demand” on page 91) or bandwidth on
demand operation (seeConfiguring ISDN Bandwidth on Demand” on
page 92), thes
e services are automatically used by the IP routing
software.

2.

Create VLANs and add untagged ports

Each new VLAN is created with a VLAN name that is unique in the router,
and a VLAN Identifier (VID) that uniquely identifies the VLAN on the
physical LAN. If the VLAN name begins with “vlan” and ends in a
number then the number must be the same as the VID specified. To create
VLANs, enter the command:

CREATE VLAN=vlanname VID=2..4094

In this example two VLANs are created by entering the commands:

CREATE VLAN=vlan2 VID=2

CREATE VLAN=vlan3 VID=3

To add untagged ports to vlan2, enter the command:

ADD VLAN=vlan2 PORT=2-4

To add untagged ports to vlan3, enter the command:

ADD VLAN=vlan3 PORT=1-3

See the Switching on the AR410 or Switching on the AR450 chapter in the
AR400 Series Router Software Reference for more detailed information about
creating VLANs and VLAN ports.

Advertising