Selecting a site for the switch – Allied Telesis AT-FS709FC User Manual

Page 27

Advertising
background image

AT-FS709FC Series Installation Guide

17

Selecting a Site for the Switch

Be sure to observe the following requirements when choosing a site for your
switch:

G Make sure that the switch’s power is accessible and cables can be

easily connected.

G Air flow around the switch and through its vents on the side and rear

must not be restricted.

G If you are installing the switch on a desk or table, make sure that the

surface is level and secure.

G Do not place objects on top of the switch.
G Select a site that is dust-free and moisture free.
G Use dedicated power circuits or power conditioners to supply reliable

electrical power to the network devices.

Twisted Pair Cable and Fiber Optic Cable Guidelines

When installing the twisted pair cables for your network, be sure to observe
the following guidelines:

G For 10Base-T operation (10 Mbps), use Category 3 100-ohm or better

shielded or unshielded twisted pair cabling.

G For 100Base-TX operation (100 Mbps), use Category 5 100-ohm or

better shielded or unshielded twisted pair cabling.

G The maximum length for a twisted pair cable is 100 meters (328 feet).
G Cabling should be kept away from sources of electrical noise such as

radios, transmitters, broadband amplifiers, power lines, electric
motors, and fluorescent fixtures.

When installing the fiber optic cable for your network, be sure to observe the
following guidelines:

G The fiber optic port on the switch requires either 54/125 or 60/125

micron core/cladding multimode fiber optic cable.

G The maximum operating distance of the fiber optic port is 2 kilometers

(1.25 miles).

Advertising