Vertical contact toaster, Maintenance (continued) – A.J. Antunes & Co VCT-2000 9210118 User Manual

Page 14

Advertising
background image

VERTICAL CONTACT TOASTER

14

P/N 1010832 Rev. E 02/13

MAINTENANCE (continued)

Checking the Roller Tensioners

(every 3–6 months)

MEASURING THE ROLLER TENSIONERS

1. Measure the Roller Tensioner on both inner

Conveyor Covers (Figure 11) using a U.S Nickel.

2. The space between the inner Conveyor Cover

and bottom of the Tensioner wheel should be

13/16” (2.1 cm) or the height of a U.S. Nickel.

3. Adjust or replace any damaged ones as

recommended.

REPLACING THE ROLLER TENSIONERS

1. Remove the acorn nuts and old Roller Tensioner

Assembly (Figure 12).

2. Replace Tensioner Assembly, and reassemble.

3. Make sure the spacers are placed inside the

Tensioner arm. The spacers are smaller than the

holes to allow the Tensioner to pivot freely.

Weld

Screws

Acorn Nuts

Spacers

Tensioner

Assy.

Tape

Figure 12. Replacing the Roller Tensioner

Figure 11. Measuring Roller Tensioner

Advertising
This manual is related to the following products: