Diagram 1 – Arboria Pyramid Trellis User Manual

Page 2

Advertising
background image

P age 2

STEP 1: ATTACHING THE FIRST SIDE TO THE PYRAMI D CA P

Place the solid cedar pyramid cap on its side on your work surface. Place the “point” of one triangular trellis panel on top of
the connector stub at the base of the pyramid, with the cross-members on the underside of the trellis panel (facing down).

Line up the right edge of the right-hand side of the trellis piece so that it is exactly flush with the right side of the connector
stub (see Diagram 1). The left edge of the left-hand side of the trellis piece should be flush with the left edge of the pyramid
(

not

the connector stub!).


Start screws in the two holes at the top of the trellis piece.

DIAGRAM 1

Connector

stub

Right edge of frame

flush with edge of

connector stub

Connector

stub

Holes down

left edge

Holding the trellis end firmly against the base of the pyramid cap and with its right edge flush to the connector stub, drive
in the right-hand screw. Then drive in the left screw, again keeping a snug fit.

Advertising