AMX Distribution Matrix Precis SD User Manual

Page 23

Advertising
background image

Installation & Setup

18

Precis SD Instruction Manual

Installation Procedure

A flow chart showing the installation sequence is in FIG. 5. The procedure following provides general
steps with references to detailed information found later in this manual.

Caution: To prevent overheating and airflow restriction, avoid placing high heat producing
equipment directly above or below the enclosure. The system requires a minimum of one empty rack
unit above and below (three empty rack units are recommended).

To install and set up a Precis SD system in a rack:

1.

Attach the rack ears per FIG. 6.

2.

Place the enclosure in the rack and attach front-mounting screws to hold it firmly in place (FIG. 7).

Tip: When placing enclosures, keep in mind that the optimal viewing angle for a control panel is eye
level

.

3.

Optional – Establish communication with an external control device/system; see “Attaching
External Controllers” on page 20.

FIG. 5

Installation procedure

FIG. 6

Attach rack ears to sides of enclosure

FIG. 7

Place in rack and fasten with mounting screws

Advertising