Installation joist mounting-Ⅰ) continued Ⅰ(between, Installation Ⅱ(joist mounting) – Panasonic FV-07VFH3 User Manual

Page 10

Advertising
background image

④ Fix the louver assembly with the 3 of the
M4X8 mechanical screws in the accessory.
(Fig.18)

10

INSTALLATION

JOIST MOUNTING-Ⅰ) CONTINUED

Ⅰ(BETWEEN

⑤ Install the filter mesh again and attach the
unclenched screw caps again.(Fig.19)

10.Paste the switch label provided in the
accessory package on the switch panel.

s

(Fig.20)

[Optional]

Attach the given switch labels (in accessories)
on the wall switch (not included) as shown in
the diagram for clearer indication.(Fig.20)

Switch
labels

On

Heat

Off

Vent

Fig.20

Screw caps(2 pcs)

Fig.18

Fig.19

INSTALLATION Ⅱ(JOIST MOUNTING)

1. Make a hole of 10 X 10 inches (270 X
270mm) adjacent to a joist.(Fig.21)

2. Assemble the hanger unit.
Put the adaptor into the hanger holder.
(Fig.22)

3. Fix the hanger unit to the ceiling.
(1) Using 1 of the ST4.2X30 tapping screws
provided

accessory package to fix

the hanger unit to the ceiling.

(2)

in the

(Fig.23)

Using 2 of the ST4.2X30 tapping screws

provided in the accessory package to fix
the hanger unit to the joist.(Fig.24)

4.Slip the circular duct onto the adaptor and
secure it with duct tape.(Fig.24

Joist

Duct
tape

Circular
duct

Adaptor

Hanger
holder

Fig.21

Fig.22

Fig.23

Fig.24

3"
5

10 (

27

0)

3

"

5

10 (270)

3"

5

3"
5

Advertising