American Standard Copeland T005.730 User Manual

Page 2

Advertising
background image

1

3

5

2

4

M 9 6 8 0 1 4

TEMPERATURE CALIBRATION

SET HOT LIMIT STOP

5

Check that arrow marking B points vertically upwards. If not, push the BLACK
CLAMP (1) on the SECURING RING (2) to the right, pull off KNOB MOUNT (3)

and reinstall KNOB MOUNT (3) with arrow "B" pointing upwards.

For 100˚F adjustment, turn the water supply on. Turn KNOB MOUNT (3) until the spout

temperature is 100˚F. Check that arrow marking A on the KNOB MOUNT (3) still points

upward after adjusting the thermostat to 100˚F. If not, pull out the RED LOCKING DEVICE (5).

Remove KNOB MOUNT (3) without turning by sliding out as indicated by the arrow.
Reinstall the KNOB MOUNT (3) so that the arrow marking A points upwards.

The maximum mixed water temperature is set at 109˚F at the factory.
This setting can be changed if desired.

Remove the TEMPERATURE LIMIT STOP (4) (H shaped Black Plastic part).

Reinstall it at the desired notch as indicated in the diagram to limit the maximum
mixed water temperature to 104˚F or 112˚F.

Reinstall RED LOCKING DEVICE (5).

ARROW

"A"

ARROW

"B"

104

109

112

OPERATING THE VALVE

4

2

HANDLE INSTALLATION

Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:

TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION

3

Remove check stops and re-install them transposed.

Shut off water supply.
Remove handle and rim

CHECK STOP

(RED TO BLUE)

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.

Turn the water supply back on and perform the temperature adjustment in step 4.

CHECK STOP

(BLUE TO RED)

Turn on water supply on and test installed fitting.

If the system is delivering all Hot or all Cold and no mixed water the pipes are probably transposed.
See step 3 for TRANSPOSED SUPPLY PIPING.

Operate valve from off to cold to hot. Check temperature. If max mixed water

temperature is to hot or to cold see step 4 and re-calibrate the valve.

OFF

COLD

HOT

1

3

2

6

4

Install HANDLE BASE (1) onto TEMPERATURE CONTROL KNOB (2)

Install HANDLE ADAPTER (3) onto HANDLE BASE (1) and tighten

with SCREW (4).

Align HANDLE (5) and push onto HANDLE ADAPTER (3).

Tighten SET SCREW (6) in handle with HEX WRENCH (7) SUPPLIED.

6

5

7

1

TRIM INSTALLATION

Push CAP (1) over the O-RING SEAL (2).

1

3

Push ESCUTCHEON HOLDER (3) with lightly greased

O-RING SEAL (4) over CAP (1).

Attach the FIXATION PLATE (7) to the ESCUTCHEON

HOLDER (3) with the two SCREWS (5) provided.

Push ESCUTCHEON (6) flush against finished wall.

2

7

GREASE ESCUTCHEON

O-RING SEAL

4

Advertising