Balboa Water Group 1 Air Control User Manual

1” air control instructions

Advertising
background image

1” AIR CONTROL INSTRUCTIONS

The correct hole size for the 1” air control is 1-3/4”

Before drilling hole to install the air control, make sure mounting surface is flat. This will help assure

1.

the best seal.
Drill one 1-3/4” hole for the air control.

2.

Remove nut (#4) and gasket (#3) from air control.

3.

Place silicone on backside of flange of air control body (#2) and install air control through hole in

4.

spa/bathtub.
Place gasket (#3) onto body (#2) on the outside of spa/bathtub.

5.

Hand tighten nut (#4) onto body (#2).

6.

Remove excess silicone from around flange of air control and surface of spa/bathtub.

7.

Glue 1” pipe to bottom of air control.

8.

DO NOT USE ANY TYPE OF PETROLEUM BASED LUBRICANTS ... THEY WILL DAMAGE THE
PRODUCT.

#1 1” AIR STEM ASSEMBLY 30-2108
#2 1” AIR BODY ASSEMBLY 30-2107
#3 1”

GASKET

30-3705

#4 1”

NUT

30-3706

88-2100 Rev C July 1, 2009

Advertising