Balboa Water Group Proper User Manual

Balboa Water Group Accessories for air

Advertising
background image

HOMEOWNER / INSTALLER

INSTRUCTIONS FOR THE PROPER INSTALLATION

OF AIR BLOWERS

QP-INSTR Rev A August 11, 2009

INSTALLATION GUIDELINES

WARNING:

Electrical power must be turned off before electrical

connections are made.

IMPORTANT:

Follow the specifications below when installing blower.

It lists the allowable minimum and maximum injectors per each

style of injector for proper blower operations.

1. If you are unfamiliar with electrical connections, please have the installation done by

a qualified electrician.

2. Verify that the required blower motor voltage matches the line voltage, i.e. 115v or 230v.
3. All blowers must have ground wire connections.
4. Maximum allowable amp reduction when in use:

a. 1/2 amp for a 230v motor

b. 1amp for a 115v motor.

5. Leak test line before final connections are made at the blower and the tub.
6. Compact Quiet Flow Blowers can be mounted vertically or horizontally.
7. Check valves are necessary for new installations and can be purchased from your

distributor or GG Industries as follows:

a. GG Model No. 42170 / 42172

b. GG Model No. 42225 / 42230 / 42235 / 42240

8. Minimum / Maximum Injector Guidelines

a. Mini / Micro Injectors – Minimum 24, Maximum 40

b. Standard Injectors – Minimum 16, Maximum 34

9. Do not glue blower directly into pipe.

WARNING:

All glue fumes in the blower should be allowed to dissipate

before turning on the blower. Motor spark could ignite fumes

causing explosion.

Advertising