3. Connect the main power lines to the disconnect

switch and main grounding lug(s). Torque field

connections to 20 in.-lbs.

4. Wire the optional convenience outlet. The

convenience outlet requires a separate 115V power

supply circuit. The circuit must include short circuit

protection which may need to be supplied by others.

Single Phase

When ground is required, attach

to ground A or B with no. 6

thread forming screw. To reverse,

interchange T-1 and T-4

Three Phase

A complete wiring diagram is attached on

the inside of the control center door(s). It is

also available in the HMD Wiring Diagram

Supplement.

Gas

All gas piping must be installed in accordance

with local codes, or in the absence of local

codes, in accordance with the National Fuel

Gas Code, ANSI 2223.1/NFPA 54, or the

CAN/CSA B149.1 Natural Cas and Propane

Installation Code.

Do not connect the unit to gas types other than

what is specified and do not connect the unit to gas

pressures that are outside of the pressure range

shown on the label.

When connecting the gas supply, the length

of the run must be considered in determining

the pipe size to avoid excessive pressure drop.

Refer to a Gas Engineer’s Handbook for gas

pipe capacities.

Refer to the heater rating plate for determining

the minimum gas supply pressure for obtaining

the maximum gas capacity for which this heater

is specified.
1. Determine the supply gas requirements by looking

at the unit’s nameplate on the outside of the unit on

the control center side.

2. When the supply gas pressure exceeds the maximum

gas pressure shown on the nameplate, an additional

regulator (by others) is required to reduce the

pressure. The regulator must have a listed leak

limiting device or it must be vented to the outdoors.

The regulator located inside the unit is used to adjust

the unit’s maximum output temperature.

3. If an optional vent line is located between the safety

shutoff valves it must be piped to the outdoors.

Reference the National Fuel Gas Code for

additional vent line requirements.

4. Test the system for leaks.

Operation

Pre Start-Up

Follow the pre start-up list before

proceeding. Follow the procedure in the

exact order that it is presented.
Failure to do so could result in serious injury

or death and damage to equipment.

Pre Start-Up:

General

1. Get: voltage & amperage meter, thermometer, micro

amp meter, u-tube manometer & tachometer.

2. Perform a gas leak check during heater start-up, to

verify the gas tightness of the heater’s components

and piping under normal operating conditions.

3. Disconnect and lock-out all power and gas.

Blower

1. Check the housing, blower, and ductwork for any

foreign objects before running the blower.

2. Rotate the fan wheel by hand and make sure no

parts are rubbing. Check the V-belt drive for proper

alignment and tension (a guide for proper belt tension

and alignment is provided in the Belt Maintenance

section).

3. Check fasteners, set screws and locking collars on

the fan, bearings, drive, motor base, and accessories

for tightness.

4. Compare the supplied voltage, hertz, and phase with

the unit and motor’s nameplate information.

5. Open the blower access door and run

the blower momentarily to determine

the rotation. Arrows are placed on the

blower scroll to indicate the proper

direction.

NOTICE! If the blower is rotating in

the wrong direction, the unit will move

some air, but will not perform as designed. Be sure

to perform a visual inspection to guarantee the

correct blower rotation.

• To reverse the rotation on three phase units,

disconnect and lock-out the power, then interchange

any two power leads.

• To reverse the rotation on single phase units,

disconnect and lock-out the power, then rewire the

motor per the motor manufacturer’s instructions.

6. Check for unusual noise, vibration or overheating

of the bearings. Reference the Troubleshooting

section for corrective actions. Excessive vibration

T-1
T-4

Ground B

L 2

L1

Ground A

Line

4 5 6

1

7

2

8

3

9

L1 L2 L3

4 5 6

7 8 9

1 2 3

L1 L2 L3

Low Voltage

208/230 Volts

High Voltage

460 Volts

3 Phase, 9 Lead Motor

Y-Connection

7

1

6

7 8 9

4 5 6

1 2 3

Low Voltage

208/230 Volts

High Voltage

460 Volts

8

2

4

9

3

5

L1

L3

L2

L1

L3

L2

3 Phase, 9 Lead Motor

Delta-Connection

Advertising