Initial power up procedure – Lyntec RPC User Manual

Page 22

Advertising
background image

139-0498-0122

Chapter Four--Wiring

22

INITIAL POWER UP
PROCEDURE

With panel door open and breakers visible, turn on the panel
main breaker and the Controller Power 15 Amp circuit breaker.

The green ‘DC OK’ LED should illuminate on the Power Supply
and the green ‘STATUS’ LED on the Buff er unit should begin
fl ashing steadily. The Buff er ‘STATUS’ LED will be constantly lit
when the unit has been fully charged.

The Controller LCD display and orange Power LED should
illuminate. If installed, the orange Power LED’s on the I/O
Expander boards and the orange Power LED on the MPE board
will illuminate.

Advertising