Verifying System Requirements

Prior to completely removing the Power Soak unit from the crate, it is necessary
to verify certain requirements. Remove

only the lid

of the crate at this time.

Verifying System Direction

The Power Soak can be built as a
“Left to Right” or as a “Right to Left”
configuration with a variety of
options. Look inside the crate and
verify that the configuration of the
machine matches the specifications
of the order description.

Verifying the Electrical Requirements

The electrical requirements for the machine are on
the machine identification tag located on the side
of the wash tank, next to the motor. The electrical
service in the facility where the machine is to be
installed must be rated for the capacity shown on
the identification tag. This machine will require a
permanently mounted disconnect that is in a
“liquid tight” enclosure. Do not use an in-line plug
for disconnecting the machine from the electrical
source. Contact a licensed and certified
electrician to make the enclosure installation if one
is not present. Use the tables in the appendix to
determine the appropriate breaker (overcurrent
protection) and wire size for the machine’s
electrical service.


WARNING: DO NOT connect the machine using a power cord and
plug or an extension cord of any kind.

WARNING: Kitchens are a wet environment which require all
electrical connections to be “liquid tight”.

Electrical installation must conform to all applicable local wiring codes.
All electrical connections must be “liquid tight” and readily accessible
for inspection after installation without moving the Power Soak
machine or any of its accessories.