Preinstallation requirements, Selecting a site, Checking the package contents – Acer Altos G300 Series User Manual

Page 19

Advertising
background image

7

Preinstallation requirements

Selecting a site

Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:

Near a grounded power outlet

Clean and dust-free

Sturdy surface free from vibration

Well-ventilated and away from sources of heat

Secluded from electromagnetic fields produced by electrical
devices such as air-conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

Acer Altos G300 (Model: G301) system

Acer Altos G300 Series user’s guide

EasyBUILD CD

Acer Altos G300 Series accessory box

System keys (hung inside the front panel door)

If any of the above items are damaged or missing, contact your dealer
immediately.

Save the boxes and packing materials for future use.

aa300.book Page 7 Tuesday, December 17, 2002 5:27 PM

Advertising
This manual is related to the following products: