Installing column wrap, Tools required painting parts fastening cutting, Storage & handling – AZEK Column Wrap User Manual

Page 2: Gluing, Page 2

Advertising
background image

Page 2

Installing Column Wrap

Tools Required

Painting

Parts

Fastening

Cutting

• AZEK Column Wrap can be cut using the same tools used to cut

lumber.

• Carbide tipped blades designed to cut wood work well. Avoid using

fine tooth metal cutting blades.

• Rough edges from cutting may be caused by excessive friction, poor

board support, worn or improper tooling.

• For best results, use fasteners designed for wood trim and wood siding.

These fasteners have a thinner shank, blunt point, and full round head.

• To take advantage of the performance of AZEK products, use a highly

durable fastener such as stainless steel or hot dipped galvanized.

• The fasteners should be long enough to penetrate the solid wood

substrate a minimum of 1 1/2

".

• Standard nail guns work well with AZEK Trim products. If using

pneumatic tools, the air pressure should be regulated so fasteners
slightly penetrate the surface.

• AZEK COLUMN WRAP FASTENING CONSIDERATIONS
(Use one of the following):

• #7 trim screw
• 16 gauge T-nail
• 15 gauge round head
• Fasteners should be a minimum of 1 1/2” in length

• AZEK Column Wrap does not require paint for protection, but

accepts and holds paint very well.

• If you choose to paint, use a 100% acrylic latex paint with colors

having a Light Reflective Value (LRV) of 55 or higher.

• For darker colors (LRV of 54 or lower) use paints with heat

reflective characteristics specifically formulated for use on vinyl/
PVC products. These paints/coatings are designed to reduce
excessive heat gain.

• WARNING: It is recommended that should you choose to paint a

darker color (LRV of 54 or lower) all aforementioned installation
steps should be followed.

• Follow the paint manufacturers recommendations for use and

compatibility with AZEK Column Wrap.

• AZEK Column Wrap surfaces must be clean, dry, and void of any

foreign material such as dirt, oil, grease or other contaminates that
may come from normal handling, storage and/or installation prior
to painting.

• Moisture cycling is a main reason for paint failure on wood. Since

AZEK material absorbs almost no moisture, paints last longer on
AZEK products than it does on wood.

• Since AZEK products have almost no moisture absorption, paints

may take longer to cure on AZEK material than on wood. Generally
paints on AZEK products will be dry to the touch quickly, but may
take up to 30 days to fully cure depending on the humidity and
temperature.

Storage & Handling

• Care should be taken in handling the individually wrapped column

wraps to prevent tearing of tape or cracking at miter lock corner joints.

• Store AZEK Column Wrap on a flat level surface.
• Since AZEK Trim products are more flexible than wood, they may

conform to uneven surfaces. Ensure that storage areas, as well as all
framing and substructures, are flat and level to minimize uneven surfaces.

• AZEK Column Wrap has a density comparable to pine and should be

handled in similar fashion as pine to avoid damage.

• Units of AZEK products are shipped from the manufacturer in a

protective covering. If covering has been removed, take care to keep
product free of dirt and debris at jobsite. If product gets dirty, clean
after installation.

Gluing

• For best results, eliminate debris from grooved joints prior to applying

glue so that joints can maintain good contact with each other.

• For best results, apply adhesive to all joints to prevent joint

separation.

• The glued joint should be secured to allow adequate bonding time.

Do not use a fastener to secure the joint.

• AZEK Adhesive has a working time of approximately 10 minutes and

will be fully cured in at least 24 hours.

• If standard PVC cements are used, these products typically cure

quickly which will result in limited working time and may reduce
adhesive strength.

Ad hes iv e

• AZEK Column Wraps are not structural and are not intended for load bearing

applications.

• Manufactured edges of the column wrap are sharp and should be handled with

care.

• AZEK Column Wrap should be installed in accordance with the local building

codes and the installation guidelines included below. AZEK Building Products
Inc. accepts no liability or responsibility for the improper installation of this
product. Failure to install AZEK Column Wrap in accordance with applicable
building codes and this Installation Guide may lead to personal injury, affect
product performance and void the product warranty.

WARNING! Please read all instructions completely before starting any part of the installation.

• AZEK Column Wrap may not be suitable for every application. It is the sole

responsibility of the installer to be sure that AZEK Column Wraps are fit for
the intended use. Since all installations are unique, it is also the installer’s
responsibility to determine specific requirements in regards to each application.

• AZEK Building Products recommends that all applications be reviewed by a licensed

architect, engineer, or local building official before installation. If you have any
questions or need further assistance, please call AZEK Customer Service at 877-ASK-
AZEK (877-275-2935) or visit our website at www.AZEK.com.

Advertising