Installing azek rail with cablerail by feeney – AZEK Rail User Manual

Page 6

Advertising
background image

Page 6

Installing AZEK Rail with CableRail by Feeney

®

TRANSFER HOLE LOCATION ONTO POST SLEEVE

• Use an extra Intermediate Baluster, rested on the Bottom Rail,

as a template for the CableRail Hardware and through holes.

8

• Using a 3/16” drill bit to transfer your marks onto the Post Sleeve.

ATTACH TOP SUPPORT RAIL

9

INSTALL TOP RAIL AND POST CAPS

10

Pre-drill

9/64”

#10 x 1”
Coated
Screws

#10 x 1”
Coated
Screws

a

b

Intermediate
Base Plate

Support

Rail

Intermediate

Baluster

Pre-drill 3/16”
#8 x 1 3/4” Coated
Screws

b

c

Secure Post
Caps with
exterior
grade caulk.

Pre-drill 7/64”
#8 x 3” Green
Coated Screws

a

Advertising