STRAIGHT RAIL INSTALLATION GUIDELINES for

AZEK Premier

AZEK Trademark

AZEK Reserve

Page 1

(1) Handrail

Hardware

1

Parts

Tools Required

Pencil

Measuring

Tape

Drill

Recommended:

Impact Driver

Mitre Saw

fitted with a

high tooth

count finish

carpentry blade

1/8”

Drill

Bit

5/16”

Drill

Bit

(2) Top Rail
Straight Bracket

(2) Threaded

Plates

(2) Spring Clip Threaded
Plate Retainer

(2) Bottom Bracket
Base

(2) Bottom Bracket
Flange + Set Screw

.

(5) 1” #8 Wood
Screws

(8) 5/8” #10 Machine

Screws

(1) Spring Clip
Installation Tool

Trademark Profiles Shown
Throughout Instructions

Balusters
(13) 6’ Kit or (18) 8’ Kit

US:

(1) 4 3/8”
Center Support
Canada:
(1) 2 3/8”
Center Support

Premier
Top Rail

Reserve
Top Rail

(1) Top Retainer

(1) Bottom Rail

Premier
Bottom
Rail

Reserve
Bottom
Rail

(1) 3/16” Allen Key

(1) T-25 Bit

(2) Baluster Swing
Brackets

(1) Center Support
Bracket

Baluster Screws
(28) 6’ Kit
(38) 8’ Kit

(8) 2 1/2” #10 Wood
Screws

Prepare for
Post Sleeves

3/16”

Drill

Bit

• The 4 x 4 should be completely “boxed in” around all 4 corners of the

firmest attachment.

• Make sure posts are level and plumb.

• If post is twisted or oversized, trim as necessary so post sleeve slides

easily over post. (Do not force sleeve over post)

• Post sleeves may also be used over wood posts installed with Surface

Mount Bracket or over Tallboy Surface Mount Bracket.

• Post sleeves should not be notched for installation.

• If installing using a Surface Mount Bracket or Tallboy Surface Mount

Bracket, please refer to those specific installation instructions.

• IMPORTANT: Must check with local building code for proper installation

of wood post and decking attachment.

WARNING: Post sleeves are not designed to be used in

structural applications. Therefore, they should not be used

where they may be subject to weight bearing applications

such as supports for a roof of a porch or deck.

IMPORTANT

Make sure that the

DRIVE TOOL/DRILL

is configured or set

to use the SCREW

setting when driving
and/or tightening all

FASTENERS.

© 2013 AZEK Building Products. All rights reserved

• Please read all instructions completely before starting any part of the installation.
• Each AZEK Premier and AZEK Trademark railing kit comes complete with all parts, hardware and installation guide to install one

complete rail section (excluding posts.)

• Each AZEK Reserve railing kit comes complete with all parts, hardware and installation guide to install one complete rail section

(excluding handrail and posts.)

• Railing sections have been pre-cut to 6 ft., 8 ft. or 10 ft. lengths. Check to ensure that the kit is complete.
• AZEK Rail should be installed using the same good building principles used to install wood or composite railing and in accordance with

the local building codes and the installation guidelines included below. AZEK Building Products Inc. accepts no liability or responsibility

for the improper installation of this product.

• AZEK Rail may not be suitable for every application and it is the sole responsibility of the installer to be sure that AZEK Rail is fit for

the intended use. Since all installations are unique, it is also the installer’s responsibility to determine specific requirements in regards to
each Rail application.

• AZEK Building Products recommends that all applications be reviewed by a licensed architect, engineer or local building official before

installation. If you have any questions or need further assistance, please call AZEK Customer Service at 877-ASK-AZEK (877-275-2935)
or visit our website at www.azek.com.

• AZEK Railing is tested as a whole system and should be used that way. It is not intended to be used in conjunction with other railing

systems or fasteners.

• The following Installation Guidelines are applicable for installation of AZEK Premier, AZEK Trademark, and AZEK Reserve Rail Systems

(except AZEK Reserve over post applications).

• IMPORTANT: Make sure the DRIVE TOOL/DRILL is configured or set to use the SCREW setting when driving and/or tightening all FASTENERS.

• SAFETY: Always wear goggles when handling, cutting, drilling and fastening materials.
• NOTE: Check local code requirements prior to installation.

1

Tools Required

Hardware

Pencil

Measuring Tape

Automatic

Center Punch

Drill

Recommended: Impact Driver

Mitre Saw

fitted with a

high tooth

count finish

carpentry blade

1/8”

Drill

Bit

5/16”

Drill

Bit

(2) Top Rail
Straight Bracket

(2) Threaded Plates

(2) Spring Clip Threaded
Plate Retainer

(2) Bottom Bracket
Base

(2) Bottom Bracket
Flange + Set Screw

.

(5) 1” #8 Wood Screws
(8) 5/8” #10
Machine Screws

(1) Spring Clip
Installation Tool

(1) 3/16”
Allen Key

(1) T-25

Bit

(2) Baluster Swing
Brackets

(1) Center Support
Bracket

Baluster Screws

(8) 2 1/2” #10 Wood
Screws

Prepare for
Post Sleeves

3/16”

Drill

Bit

• The 4 x 4 should be completely “boxed in” around all 4 corners of the

firmest attachment.

• Make sure posts are level and plumb.

• If post is twisted or oversized, trim as necessary so post sleeve slides

easily over post. (Do not force sleeve over post)

• Post sleeves may also be used over wood posts installed with Surface

Mount Bracket or over Tallboy Surface Mount Bracket.

• Post sleeves should not be notched for installation.

• If installing using a Surface Mount Bracket or Tallboy Surface Mount

Bracket, please refer to those specific installation instructions.

• IMPORTANT: Must check with local building code for proper installation

of wood post and decking attachment.

WARNING: Post sleeves are not designed to be used in

structural applications. Therefore, they should not be used

where they may be subject to weight bearing applications

such as supports for a roof of a porch or deck.

IMPORTANT

Make sure that the

DRIVE TOOL/DRILL

is configured or set

to use the SCREW

setting when driving

and/or tightening all

FASTENERS.

Rail Packs

Baluster Packs

(1) Handrail

(1) Top Retainer

Composite: 2.5 balusters per LFT

Metal: 2.75 balusters per LFT

Center Support

(1) 4 3/8”
For 2” gap below bottom rail,

cut Center Support to 2 3/8”

Premier

Bottom Rail

Reserve

Bottom Rail

Premier
Top Rail

Reserve
Top Rail

(1) Bottom Rail

Trademark Profiles shown throughout Instructions

Composite

Square

Metal

Square

Metal

Round

15

per

pack

20

per

pack

Recommended Pilot Point