AZEK Stair Rail with Universal Bracket User Manual

Tools required recommended, Parts hardware, Prepare for post sleeves

Advertising
background image

STAIR RAILING WITH UNIVERSAL BRACKET INSTALLATION GUIDELINES for

AZEK Premier

AZEK Trademark

AZEK Reserve

Page 1

Pencil

Measuring

Tape

Drill

5/16”

Drill Bit

Scrap

Length of

Wood

1/8”

Drill Bit

7/16”

Wrench

3/16”

Drill Bit

3/8”

Drill Bit

Impact

Driver

Speed

Square

Mitre Saw

fitted with a
high tooth
count finish

carpentry

blade

Tools Required

Recommended

(2) Threaded Plates

(2) Spring Clip Threaded

Plate Retainer

(4) Lag

Screws

(4) Balls

(4) Cups

(4) Brackets

(4) Stair Brackets

(1) T-25 Bit

(1) Spring Clip

Installation Tool

(28) Baluster

Screws

(8) 2 1/2”

#10 Wood

Screws

(5) 1” #8 Wood
Screws

(8) 5/8” #10 Machine

Screws

(1) Handrail

(1) Top Retainer

Trademark Profiles Shown throughout Instructions

Premier

Profiles

Reserve
Profiles

(13) Balusters

(1) Bottom Rail

Parts

Hardware

Universal Bracket Pack

1

Prepare

for post

sleeves

NOTE: UNIVERSAL BRACKETs are needed for installations involving compound rail angles. For simple

stair angles use brackets included in Stair Rail kits. Maximum horizontal angle of the Universal Ball

Bracket is 22.5˚. Maximum vertical angle of the Universal Ball Bracket is 37˚.

• The 4 x 4 should be completely “boxed in” around all 4 corners of the firmest attachment.

• Make sure posts are level and plumb.

• If post is twisted or oversized, trim as necessary so post sleeve slides easily over post. (Do not force

sleeve over post)

• Post sleeves may also be used over wood posts installed with Surface Mount Bracket or Tallboy

Surface Mount Bracket.

• Post sleeves should not be notched for installation.

• If installing using a Surface Mount Bracket or Tallboy Surface Mount Bracket, please refer to those

specific installation instructions.

• IMPORTANT: Must check with local building code for proper installation of wood post and decking attachment.

IMPORTANT

Make sure that the

DRIVE TOOL/DRILL

is configured or set

to use the SCREW

setting when driving

and/or tightening all

FASTENERS.

WARNING: Post sleeves are not designed to be used in structural applications.

Therefore, they should not be used where they may be subject to weight

bearing applications such as supports for a roof of a porch or deck.

© 2013 AZEK Building Products. All rights reserved

• Please read all instructions completely before starting any part of the installation.

• Each AZEK Premier and AZEK Trademark railing kit comes complete with all parts, hardware and installation guide to install one

complete rail section (excluding posts.)

• Each AZEK Reserve railing kit comes complete with all parts, hardware and installation guide to install one complete rail section

(excluding handrail and posts.)

• Railing sections have been pre-cut to 6 ft. lengths. Check to ensure that the kit is complete.

• AZEK Rail should be installed using the same good building principles used to install wood or composite railing and in accordance with

the local building codes and the installation guidelines included below. AZEK Building Products Inc. accepts no liability or responsibil-

ity for the improper installation of this product.

• AZEK Rail may not be suitable for every application and it is the sole responsibility of the installer to be sure that AZEK Rail is fit for

the intended use. Since all installations are unique, it is also the installer’s responsibility to determine specific requirements in regards

to each Rail application.

• AZEK Building Products recommends that all applications be reviewed by a licensed architect, engineer or local building official before

installation. If you have any questions or need further assistance, please call AZEK Customer Service at 877-ASK-AZEK (877-275-

2935) or visit our website at www.azek.com.

• AZEK Railing is tested as a whole system and should be used that way. It is not intended to be used in conjunction with other railing

systems or fasteners.

• The following Installation Guidelines are applicable for installation of AZEK Premier, AZEK Trademark, and AZEK Reserve Rail Systems

(except AZEK Reserve over post applications).

• IMPORTANT: Make sure the DRIVE TOOL/DRILL is configured or set to use the SCREW setting when driving and/or tightening all FASTENERS.

• SAFETY: Always wear goggles when handling, cutting, drilling and fastening materials.

• NOTE: Check local code requirements prior to installation.

1

Prepare

for post

sleeves

NOTE: UNIVERSAL BRACKETs are needed for installations involving compound rail angles. For simple

stair angles use brackets included in Stair Rail kits. Maximum horizontal angle of the Universal Ball

Bracket is 22.5˚. Maximum vertical angle of the Universal Ball Bracket is 37˚.

• The 4 x 4 should be completely “boxed in” around all 4 corners of the firmest attachment.

• Make sure posts are level and plumb.

• If post is twisted or oversized, trim as necessary so post sleeve slides easily over post. (Do not force

sleeve over post)

• Post sleeves may also be used over wood posts installed with Surface Mount Bracket or Tallboy

Surface Mount Bracket.

• Post sleeves should not be notched for installation.

• If installing using a Surface Mount Bracket or Tallboy Surface Mount Bracket, please refer to those

specific installation instructions.

• IMPORTANT: Must check with local building code for proper installation of wood post and decking attachment.

IMPORTANT

Make sure that the

DRIVE TOOL/DRILL

is configured or set

to use the SCREW

setting when driving
and/or tightening all

FASTENERS.

WARNING: Post sleeves are not designed to be used in structural applications.

Therefore, they should not be used where they may be subject to weight

bearing applications such as supports for a roof of a porch or deck.

5/16”

Drill Bit

Scrap

Length of

Wood

1/8”

Drill Bit

7/16”

Wrench

3/16”

Drill Bit

3/8”

Drill Bit

Speed Square

(2) Spring Clip Threaded
Plate Retainer

(4) Lag
Screws

(4) Balls

(4) Cups

(4) Brackets

(4) Stair
Brackets

Universal Bracket Pack

Tools Required

Hardware

Pencil

Measuring Tape

Impact
Drill

Mitre Saw

fitted with a

high tooth

count finish

carpentry blade

(2) Threaded Plates

(7) 1” #8 Wood Screws
(8) 5/8” #10
Machine Screws

(1) Spring Clip
Installation Tool

(1) 3/16”
Allen Key

(1) T-25 Bit

Baluster Screws

(8) 2 1/2” #10
Wood Screws

Rail Packs

Baluster Packs

(1) Handrail

(1) Top Retainer

Composite: 2.5 balusters per LFT

Metal: 2.75 balusters per LFT

Premier
Bottom Rail

Reserve
Bottom Rail

Premier
Top Rail

Reserve
Top Rail

Trademark Profiles shown throughout Instructions

Composite

Square

Metal

Square

Metal

Round

15

per

pack

20

per

pack

Advertising