1 calibrating the touch screen, Calibrating the touch screen – Beijer Electronics EPC TA150 AM EN User Manual

Page 20

Advertising
background image

Hardware Replacement

5. Remove the mounting plate (12 torx screws). Gently lift the mounting plate

with the display and power card.

12 x torx screws

6. Flip the mounting plate and unscrew the 4 torx screws, located on front or

side.

4 x torx screws

7. Re-assemble the panel in reverse order.

6.3.1

Calibrating the Touch Screen

Follow the steps below to calibrate the touch screen:
A touch calibration tool is pre-installed in the EPC TA150 AM. It can be started
from the desktop icon or from the Start menu.

Note:
Touch calibration has to be commenced within 10 seconds from when the touch screen
tool was started.

Beijer Electronics, MAEN044

20

Advertising