CertainTeed CTG_GreenGlue-Clip User Manual

Installation guide, Step 1

Advertising
background image

installation guide

installation guide

www.greengluecompany.com

866.435.8893

Step 1

Measure for placement of Green Glue Noiseproofing Clips using layout guidelines listed above.

Mark locations and install clips using appropriate screws.

Recommended screws by stud type

Wood:

Use #8 x 2-1/2”

coarse thread screws

Steel:

Use #8, 10 or 12 x 1-5/8”

Type S self-tapping screws

Concrete:

Use 3/16” dia x 2-1/4”

Tapcon or equal anchor Screw

Outermost clips must be spaced at every interval

10’

(2)

24”

(1)

48”

16”

(4)

6”

(3)

3”

Layout pattern for Green Glue Noiseproofing Clips

Install ceiling drywall before walls to allow for a

fire stop by butting ceiling drywall to studs

Green Glue Noiseproofing Clip layout

(1)

Clips are spaced no further than

48 inches apart horizontally

(2)

Hat channel must not be spaced

more than 24 inches vertically

(3)

Bottom clips must be less than 3

inches from the floor

(4)

Top clips must be less than 6

inches from the ceiling

*Clips must be placed at the outermost
studs on every piece of hat channel

Product Specifications

Width

1.25 inch

Height

4.25 inch

Depth

1 inch

Weight

.025 lbs

Max Spacing

48” on center

Recommended Load

36 lbs ~ 3 drywall layers

Max Safe Load

46 lbs ~ 4 drywall layers

Fail Load

300 lbs ~ 27 drywall layers