CertainTeed Quiet Soundproofing System User Manual

Page 4

Advertising
background image


Quiet Rock ES/ES MR Installation Instructions | Copyright ©2012 Serious Energy | September 2012 CTG-2803 |

Professional: 800-233-8990 • Consumer: 800-782-8777


Distributed in Canada by:

“squeeze”  the  QuietSeal  Pro  in  between  them.  Be  sure  to  remove  excess  QuietSeal  Pro  with  a  
rag  or  putty  knife  as  needed.  Wipe  off  any  access  QuietSeal  Pro.  DO  NOT  LEAVE  QUIETSEAL  PRO  
ON  THE  SURFACE,  AS  IT  CAN  INTERFERE  WITH  TAPE,  MUD,  PAINT  AND  OTHER  FINISHING  STEPS.    
 

SURFACE  FINISH  PER  ASTM  STANDARD    
 

• Standard  Practice  for  Use  of  Sealants  in  Acoustical  Applications:  ASTM  C919-­‐08  

 

Using  QuietRock  EZ-­‐SNAP  in  Ceiling  Construction    
 

To  use  QuietRock  EZ-­‐SNAP  panels  on  a  ceiling  application,  simply  follow  the  above  instructions  
for  walls.  CONSULT  LOCAL  BUILDING  CODES  ON  SCREW  PLACEMENT.  It  is  advised  that  you  use  a  
drywall  lift  to  install  any  drywall  on  ceilings  properly.  
 

Fire  Information  
 

1) Check  

www.QuietRock.com

 website  or  

UL  website

 for  fire  rating  information.  

2) Check  with  code  authority  to  verify  that  QuietRock  EZ-­‐SNAP  panels  can  be  added  to  your  

specific  assembly    
 

General  Notes  
 

Follow  all  OSHA  guidelines  when  completing  any  construction  project.    Use  normal  care  and  
precaution  when  working  with  Serious  Energy’s  products:  
 
QuietPutty:  

Cleanup  with  soap  and  water.  

Dispose  of  excess  QuietPutty  in  the  same  responsible  manner  as  you  would  any  building  
material.  

 
QuetRock  

Lift  the  panels  using  OSHA  guidelines,  e.g.  do  not  bend  over  and  lift  using  back  muscles;  
instead  use  the  leg  muscles.  

When  cutting  or  scoring  large  amounts  of  drywall,  follow  OSHA  regulations  concerning  
exposure  to  gypsum  dust,  including  wearing  appropriate  protective  masks  if  ventilation  
required.  

QuietRock  contains  no  materials  more  hazardous  than  standard  drywall.  Dispose  of  excess  
QuietRock  in  the  same  responsible  manner  as  you  would  any  building  material.    

Ensure  there  is  adequate  ventilation  and  temperatures  are  maintained  within  the  range  of  
50˚-­‐  95˚F  (10˚  -­‐  35˚C)  during  the  finishing  process.  
 

QuietSeal  Pro  

QuietSeal  Pro  can  be  easily  removed  with  soap  and  water.  Wear  disposable  gloves,  for  
easier  clean-­‐up.  

Dispose  of  in  accordance  with  applicable  federal,  state,  and  local  regulations.  

 
 
For  further  information  see  the  Material  Safety  Datasheet  (MSDS)  on  line  at  

www.QuietRock.com

.  

Advertising