Im-ul200v4pg4.pdf, Installation, Tool list – Varad UL200 - Solid LED Under Car Lighting System User Manual

Page 4: Bench testing technical specifications, Precautions

Advertising
background image

Installation

First, consider inspecting the mounting locations of each of
the lightbars before you begin cutting wires and drilling holes.
Map out a clean, safe route for the wires from the lightbars
up to the power source.

Mounting -

Identify suitable mounting locations under the vehicle that will
not conflict with existing mechanical components. Hold the
lightbars up to the prospective mounting location to verify that
the mounting surface is flat and compatible. Direction of the
wiring (toward the front or rear of the vehicle) is not critical to
the operation of this product.

Now that you have determined placement, begin to install the
mounting clamps. It is important to keep all mounting clamps
in-line and as straight as possible. It is a good idea to use a
reference point on your chassis such as the pinch weld
seam, etc. This will assist you in maintaining proper lightbar
alignment to the vehicle's body. There are 4 clamps per side
lightbar and 2 per each front and rear lightbar. Space the
clamps as evenly as possible, approximately 1 foot between
each clamp is suggested. Use a marker to mark each drilling
point. You can pre-drill each point with a 1/8" drill bit before
screwing in the mounting clamp screws.

Install all mounting clamps facing the same direction.
Hold the lightbar up and install a tie-strap zip tie at each
clamp location

Take the UL200 system to your nearest 12vdc power supply
or 12vdc battery to test the unit prior to vehicle installation.
C o n n e c t t h e b l a c k w i r e w / w h i t e s t r i p e t o t h e p o s i t i v e
terminal. Connect the black wire to the negative terminal.
Confirm that all of the Lightbars are lit and that all LEDs are
emitting light.

Tool List

• Wire stripper
• Wire cutter
• Drill w/ Phillips head driver
• Assorted drill bits

You will need the following tools to install this product.

Bench Testing

Technical Specifications

Materials -

LEDs -

Voltage -

Life -

Current Draw -

Polycarbonate tubes
Gallium Nitride / Gallium Arsenide
13.8vdc
50,000 - 100,000 hrs,
Red and Yellow Kits = 690ma AVG.
Blue, White and Green = 1170ma AVG.

Do not attempt to disassemble any part of the UL200 system
or damage will occur. Refer servicing to a factory authorized
dealer. Replace the fuse only with the type provided in the
fuse holder. Failure to do so can cause malfunction. Check
with local law enforcement before using while vehicle is in
motion.

Precautions

1

2

Advertising