Edsal MRWB-6 User Manual

Page 2

Advertising
background image

Take two (2) 24” braces with the shelf ledge facing up, and

one (1) short 36” post and attach rivets from the brace to the
top two (2) holes of the short post. Take one (1) long 60”
post and attach the opposite end of the brace to the holes of
the long post so the brace is level, tap down brace to seat.
Attach the bottom brace to the short post skipping one (1)
hole
from the bottom and the opposite end to the long post,
tap down brace to seat. Take one (1) drawer mount and skip
one (1) hole from the top brace
and attach rivets to the

short and long post, tap down drawer mount to seat. take
one (1) drawer slide and insert it into the slide of the drawer
mount. Repeat this step for the opposite end assembly.

Assembly Instructions for MRWB

Assembly Instructions for MRWB

Assembly Instructions for MRWB

-

-

-

6

6

6

Take four (4) 72” beams with the bend facing up, and attach

the rivets even with the braces from the two end assembly's,
and tap down to seat. Install the top shelf beam and one (1)
72” beam with the bend facing down, to the top holes of the

back posts. Next install a peg board bracket to the beam of
the top assembly using the nuts and bolts provided. Assem-
ble the center drawer assembly by taking a peg board bracket,
one (1) shelf support, and one (1) center mounting bracket
and bolt them to the work surface back beam (see figure A).
Next bolt the shelf support bracket, and the last center mount-
ing bracket to the opposite beam. Attach the two (2) center
drawer mounts by placing the rivets into the holes of the cen-
ter mounting brackets. Insert the drawer slides into the center
drawer mount slides. Add the final shelf support to the bot-
tom two (2) beams using the nuts and bolts provided.

Place the peg board to the inside of the back post of the work
bench. Using the fourth hole from the top of the back post,
align the holes of the peg board to the holes on the back
post, and fasten using the nuts and bolts provided. Align the
holes on the peg board brackets to the holes of the peg
board, and fasten the peg board to the peg board brackets
using the nuts and bolts provided. Take the four (4) 32”
drawer shelf braces and with the shelf ledge facing down,
insert the two (2) rivets into the two (2) holes located on the
drawer slides.

Add the wood shelves to the top shelf support, the draw-
ers, the bottom shelf, and the work surface to finalize the
assembly of the workbench.

Step

1

Step

2

Step

3

Step

4

4th Hole Down

Post are directional.
The slot must point
down.

Drawer Mount

Drawer Slide

Long Post

Short Post

24” Brace

Shelf Ledge Up

Skip Hole From Bottom

Tap Lightly

Center Drawer Mount

Peg Board Brackets

Figure A

Shelf Support

Top Shelf Beam

72” Beams

Peg Board Bracket

Shelf Support

Center
Mounting
Bracket

Drawer Slides

32” Drawer Shelf Braces
(Bend facing down)
(Back of drawer slides also)

Peg Board

72” Beam

(Bend facing down)

Advertising