Installation procedure for brute iv extreme – Rivera Primo Mid-Controls User Manual

Page 7

Advertising
background image

INSTALLATION PROCEDURE for BRUTE IV EXTREME

TM

MID-CONTROLS (PART NO. 2084-0504)

NOTE: USE BLUE LOCTITE ON ALL FASTENERS
TORQUE 1/4” fasteners to 120 inch pounds . . . 5/16” fasteners to 30 foot pounds . . . 3/8” fasteners to 42 foot pounds

SHIFT SIDE ASSEMBLY (P/N 2084-0500) / INSTALLATION PROCEDURE

1. Remove primary covers and primary drive per O.E. manual.

2. Remove the shifter and shifter mounting plate per O.E. manual.

3. Remove block-off plug from motor plate & install supplied shifter crossover tube(P/N 2084-0050) (Photo 7A, 7B, 7C)

4. Install spring washer (P/N 1101-0018) onto shifter shaft &

then thrust washer (P/N 1101-0022). Install shifter shaft
into shifter crossover tube. (Photo 8)

5. Install motor plate onto motorcycle per your BRUTE IV

EXTREME

TM

instructions.

6. Install belt drive and clutch per your BRUTE IV EXTREME

TM

instructions.

7. Install the shifter rod to the shifter linkage

and shifter arm on transmission using
two(2) each 5/16-24 x 1.00” socket head
cap screws (P/N 1100-0017) & one(1) each
5/16-24 lock nut (P/N 2100-0044). (Photo 9)

Photo 7A

Photo 7B

Photo 7C

Photo 8

Photo 9

2084-0050

1101-0022

1101-0018

Welded

Shifter

Linkage

1101-0017

1101-0017

2100-0044

Shifter Rod Assy

Advertising