Standard setup: left handed, Alternative setup: right handed – Chemglass CG-1969-M User Manual

Page 2

Advertising
background image

Standard Setup: Left Handed

This Is Our Standard Manifold Setup. All NPT Threads Are Sealed With Supplied
Thread Sealant. The Hose Port And Plug Opposite Hose Port Are Not Assembled,
And Will Need To Be Sealed Prior To Use. If An Alternative Setup Is Needed,
These Parts Will Need To Be Moved. The pressure gauge can be easily rotated to
face forward by loosening the swivel locking nut. Be sure to re-tighten with a
wrench. PLEASE NOTE: THREAD SEALANT IS NOT TO BE USED ON M16 OR
M30 THREADS.

Inlet Manifold:
1. Attach the supplied 3ft Triple Insulated Flexible Hose to back port of manifold block
and attach plug to front port of manifold block. All NPT threads must be sealed with
supplied thread sealant.
2. Mount Inlet Manifold to left S.S. upright.
3. Attach the hose to the reactor inlet using a Beaded Pipe Coupling (sold separately).
Tighten coupling to proper torque setting.
4. Attach circulator hose (sold separately) to bottom of inlet manifold block via the M16
or M30 thread. Hand tighten plus 1/4 turn with wrench.

Outlet Manifold with 2” Pressure Gauge & Pressure Relief Valve:
1. Attach the supplied 4ft long Triple Insulated Flexible Hose to back port of manifold
block and attach plug to front port of manifold block. All NPT threads must be sealed
with supplied thread sealant.
2. Mount Outlet Manifold to left S.S. upright.
3. Pressure valve may need to be positioned so that the 3/8” OD overflow hose barb is
pointing back. This may require breaking the seal on the thread.
4. 15 PSI pressure gauge can be easily rotated to face forward by loosening the swivel
locking nut. Be sure to re-tighten with a wrench.
5. Attach the hose to the reactor outlet using a Beaded Pipe Coupling (sold separately).
Tighten coupling to proper torque setting.
6. Attach circulator hose (sold separately) to bottom of outlet manifold block via the M16
or M30 thread. Hand tighten plus 1/4 turn with wrench.

Alternative Setup: Right Handed

Inlet Manifold
1. Attach the supplied 3ft Triple Insulated Flexible Hose to back port of manifold block
and attach plug to front port of manifold block. All NPT threads must be sealed with
supplied thread sealant.
2. Mount Inlet Manifold to right S.S. upright.
3. Attach the hose to the reactor inlet using a Beaded Pipe Coupling (sold separately).
Tighten coupling to proper torque setting.
4. Attach circulator hose (sold separately) to bottom of inlet manifold block via the M16
or M30 thread. Hand tighten plus 1/4 turn with wrench.

Outlet Manifold with 2” Pressure Gauge & Pressure Relief Valve:
1. Attach the supplied 4ft long Triple Insulated Flexible Hose to back port of manifold
block and attach plug to front port of manifold block. All NPT threads must be sealed
with supplied thread sealant.
2. Mount Outlet Manifold to right S.S. upright.
3. Pressure valve may need to be positioned so that the 3/8” OD overflow hose barb is
pointing back. This may require breaking the seal on the thread.
4. 15 PSI pressure gauge can be easily rotated to face forward by loosening the swivel
locking nut. Be sure to re-tighten with a wrench.
5. Attach the hose to the reactor outlet using a Beaded Pipe Coupling (sold separately).
Tighten coupling to proper torque setting.
6. Attach circulator hose (sold separately) to bottom of outlet manifold block via the M16
or M30 thread. Hand tighten plus 1/4 turn with wrench.

Inlet

Outlet

*** WARNING: GREEN RESTRICTOR HOSE TO BE

USED ON INLET ONLY ***

Pressure Gauge can

be easily rotated to

face forward by

loosening the swivel

locking nut. Be sure

to re-tighten with

wrench.

Advertising