INSTALLATION INSTRUCTIONS

Model 6030Y2A.102.XXX
Model 6030Y2A.202.XXX

Acrylux Builder Series (Above Floor Rough)

Thank you for selecting American Standard – the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please
read these instructions carefully before you begin. Local building codes vary by location. Observe all local plumbing and building codes.

6030Y2A.102.XXX
6030Y2A.202.XXX

STUD LAYOUT:
The American Standard Acrylux Bathtub
will fit all standard 30" x 60" tub walls.

INSTALLATION INSTRUCTIONS

STEP 1. PREPARING ALCOVE

• Strip to bare studs.

• Alcove studs should be constructed as shown above.

• Floor must be clean, smooth, and level (check with level). Sub floor must

be installed as in the stud layout. Do not install tub on open floor joists.

• If required, cut hole in sub floor as shown above to accommodate drain.

STEP 2. INSTALLING TUB

• Trial fit tub in prepared alcove. With tub sitting flat on floor, check with

level on top of tub. Tub should be level from front-to-back and
side-to-side (Fig 1).

• A floor leveling compound (smooth mortar) or a similar quick-setting

compound specifically made for leveling floors may be used to fully
support and level base.

• After tub is leveled, if alcove is larger than tub, shim between tub and

studs to create a tight fit. Screw tub flange to studs (Fig. 2).

IMPORTANT:

• Allow tub to reach room temperature before installation.
• Read installation instructions carefully before starting project.
• Keep instructions for warranty information.

31-1/2"
800mm

60"

1524mm

10"

254mm

14"
356mm

6"
152mm

8"
203mm

Drain C

L

Floor Cut Out

6" x 10"

(152 x 254mm)

= stud location

19"

483mm

30"

762mm

18"

457mm

1"

25mm

59-7/8"

1521mm

RECOMMENDED TOOLS AND MATERIALS

Tape

Measure

Mortar

Compound

(optional)

Pencil

Saber

Saw

Safety

Glasses

Screws,

1"

Flathead,

Stainless

Drill

Level

FIGURE 1. Check to assure tub is level.

FIGURE 2. If necessary, shim between tub and studs
for tight fit and screw to each stud.

CLEANING
• Do not use any abrasive cleaners or metal scrapers.
• If drywall mud or plaster gets on your shower, it may be carefully removed
with a wooden scraper made from a piece of scrap wood.
• Adhesive may be removed with mineral spirits.
• Ideal cleaners are Soft Scrub Gel

®

or Comet Gel

®

.

WARNING:

Some cleaning products are not suitable for use. Read all labels carefully.
DO NOT USE if they say “not suitable for use with ABS, acrylic, or polystyrene.