American Telecom SL PTG012 User Manual

Page 2

Advertising
background image

AMERI*CAN TELECOM INC.

Technical Document




SL PTG012 Installation Instructions

Page 2

Charger Installation

The SL PTG012 SpectraLink Phone and Charging station is shipped with its power
supply and charger regulator boards installed, and with their distribution jacks routed and
configured, as illustrated here:

SL PTG012, Rear View



At the front of the unit:

1. Lift open the front door of the enclosure.
2. Locate the pre-drilled hole-pairs, and identify the pairs that will be used to mount

the individual battery chargers (refer to the photo at the top of this page).






Door





Charger
Power
Supply
Jacks



Charger Mounting Hole-pairs

Advertising