Operator’s manual for the pressure injection cell, Setting up your pressure injection cell, Using your pressure injection cell – Next Advance PC8500 User Manual

Page 2

Advertising
background image

Operator’s Manual for the Pressure Injection Cell

BE SAFE. ALWAYS MAKE SURE THAT THERE IS NO PRESSURE IN THE CELL BEFORE
LOOSENING THE BOLTS, AND THAT THE BOLTS ARE SECURELY FASTENED BEFORE

APPLYING PRESSURE TO THE CELL. USERS MUST ALWAYS WEAR PROTECTIVE

APPAREL, INCLUDING EYEWEAR AND MUST BE TRAINED IN WORKING WITH HIGH

PRESSURE.

2

PARTS OF THE PC8500 PRESSURE INJECTION CELL

SETTING UP YOUR

PRESSURE INJECTION CELL

Setting up the Pressure Injection

Cell consists of attaching it to 1/8 inch
(outside diameter) thick walled stainless
steel tubing (not supplied with the
PC8500 Pressure Injection Cell). First,
slide the tubing through the inlet nut
until it hits a stop. Finger-tighten the
nut and then tighten it with a wrench for
1-1/4 turns. Connect the other end of
the tubing to a pressurized gas tank. It
is now set up.

USING YOUR PRESSURE

INJECTION CELL

OVERVIEW

Using the pressure injection cell

requires removing the top, inserting
your sample, replacing the top, and then
inserting a capillary. Next, inject the
sample using pressurized gas to force
the sample through the capillary. After
the injection, close the gas tank valve
and open the 3-way valve to release the
pressure.

REMOVING THE TOP

With the valves at the pressure

source turned off and the 3-way valve

Advertising