Medium Power Substation Transformers

34-10

Delivery is made by truck whenever

possible or by rail when transformer

size or weight makes truck delivery

impractical. An impact recording

device is provided on all rail ship-

ments and can be provided on truck

shipments upon customer request.

Impact recorders measure and store

three-axis impact data, identifying any

abnormally severe impacts that might

have caused damage to the trans-

former during transportation.

Howard Industries offers a full

complement of field installation

services, including unloading, inspec-

tion, assembly, vacuum oil filling, and

testing under the supervision of field

service technicians (Figure 24). Field

supervision is available for customer-

installed jobs. Field inspection

includes checks of bushings, gasket

seals, tank pressure, tap changer

operation, and controls. Tests include

turns ratio, insulation resistance,

power factor, internal moisture, and

oil dielectric strength.

DELIVERY AND INSTALLATION

Figure 24:

On-site installation