Enclosure installation prerequisites, Preparation of site and host server, Unpacking the enclosure system – Lenovo Secure Managed Client User Manual

Page 22: Enclosure, Installation, Prerequisites, Preparation, Site, Host, Server

Advertising
background image

The

SMC

-

Storage

Array

subsystem

is

housed

in

a

4

x

3

enclosure

(four

drive

bays

wide

by

three

bays

high).

The

top

bays

are

numbered

1

to

4

from

left

to

right,

as

viewed

from

the

front.

Drive

carrier

module

locations

are

identified

from

a

matrix

of

the

top

and

side

numbers.

Enclosure

installation

prerequisites

The

SMC

-

Storage

Array

is

delivered

fully

populated

with

12

drive

carrier

modules

pre-installed.

Notes:

1.

The

SMC

-

Storage

Array

with

all

its

component

parts

installed

is

too

heavy

for

a

single

person

to

easily

install

into

a

rack

cabinet.

2.

Ensure

that

you

have

fitted

and

checked

a

suitable

anti-static

wrist

or

ankle

strap

and

observe

all

conventional

ESD

precautions

when

handling

modules

and

components.

Avoid

contact

with

backplane,

server

board

and

PCI

card

components

and

module

connectors,

or

other

parts.

See

the

Safety

and

Warranty

Guide

for

additional

information

on

static

electricity

prevention.

Preparation

of

site

and

host

server

Before

beginning,

make

sure

that

the

site

where

you

intend

to

set

up

and

use

your

SMC

-

Storage

Array

has

standard

AC

power

available

from

an

independent

source

or

a

rack

power

distribution

unit

with

a

universal

power

supply

(UPS).

Unpacking

the

enclosure

system

The

package

contents

and

unpacking

procedure

are

outlined

in

the

following

figure.

Figure

13.

Drive

bay

numbering

14

User

Guide

Advertising