Ground pole installation (96cm system), Az-el mount with m8 insert and set screw, Pole specifications – Andrew 960 User Manual

Page 4: Important, Pier foundations deep frost line foundations

Advertising
background image

GROUND POLE INSTALLATION (96cm System)

MIN.

DIA.

d

d

MIN.

DIA.

ANT

2.88" or

3.00" O.D.

2.88" or

3.00" O.D.

40"

C

L

72"

36.4"

36.4"

increased,

72"

41.5"

50" depth may be

will increase

length of rebar

concrete and

accordingly.

2"

2"

50"

NOTE:

#3 REBAR x DIA. OF PIER, INSERT

FROST LINE

#3 REBAR x

DIA. OF PIER

INSERT THRU HOLE

IN TUBE & CENTER

AT 90

o

APART

(SEE NOTE)

(4)#3x24"MIN.

BELOW

THRU HOLE IN TUBE & CENTER

1" to 2"

WATER RUN OFF

GRADE

SLOPE FOR

BELOW

FROST LINE

APPROX.

1" to 2"

SLOPE FOR

(SEE

NOTE)

GRADE

WATER RUN OFF

GROUND

ANT WIND VEL. DIM “d” CONC VOL.

DIM “d”

CONC VOL.

DIM “d’

CONC VOL.

DIM “d”

CONC VOL.

POLE

80 MPH

7”

0.9

10”

1.8

7”

1.2

7”

1.2

“A”

90 MPH

8”

1.2

13”

3.0

7”

1.2

8”

1.5

96cm

100 MPH

10”

1.8 15”

4.0 7”

1.2

10”

2.4

“A” or

110 MPH

11”

2.2

17”

5.2

7”

1.2

11”

2.9

“B”

125 MPH

14”

3.5

20”

7.2 9”

1.9

14”

4.7

“B” Only

POLE SPECIFICATIONS:

Ground Pole “A” = 3.00 O.D. x 10 G.A. x 72” Steel

Ground Pole “B” = 2⁷⁄₈ O.D. x .203 Wall x 72” Steel ASTM 120 Mech Tubing (2¹⁄₂ Sch. 40)

NOTE:

Pole not supplied and must be field drilled ⁵⁄₈” dia. for #3 rebar and drilled .218 for ¹⁄₄-20 self tapping grounding
screw (see Page 7) and galvanized or painted for protection.

1 - Pole and foundation design based on the following criteria:

a) Uniform building code exposure B or C and 1.5 stability factor.
b) Vertical soil pressure of 2000 pounds per square foot.
c) Lateral soil pressure of 400 pounds per square foot.
d) Concrete compressive strength of 2500 pounds per square inch in 28 days.

2 - CAUTION - The foundation design shown does not represent an appropriate design for any specific locality since soil conditions vary

and may not meet design criteria given in Note 1. You should consult a local professional engineer to determine your soil conditions
and appropriate foundation.

Exposure “B”

Exposure “C”

Exposure “B”

Exposure “C”

PIER FOUNDATIONS

DEEP FROST LINE FOUNDATIONS

Bubble
Level

Ground Pole
Must Be
Vertical In
All Directions
Within .19 Inches
At Top (0.3ß)

STANDARD
PIER FOUNDATION

DEEP FROST
LINE FOUNDATION

3

AZ-EL MOUNT WITH M8 INSERT AND SET SCREW

IMPORTANT

M8 x 20 mm Hex Head Set Screws are recommended for schedule 40 (.203 wall) mast and
NOT RECOMMENDED for mast with a wall thickness less than 10 ga (.134) such as
Non-Penetrating Roof Mounts and Roof/Wall Mounts

.

Once fine tuning is complete and all Clamp Bolts are equally torqued to 18 ft-lbs. in
accordance with 8000842 manual, then install the two M8 x 20 mm Hex Head Set Screws
supplied. Install one in each clamp half as shown in Fig. 1.0. Torque each M8 x 20 mm
Hex Head Screw to 15 ft-lbs. Repeat torque to insure 15 ft-lbs. has been reached on both
screws.

See Manual 8000842 for additional instructions not shown here.

Clamp Bolts

M8 x 20 mm
Hex Head
Set Screw

M8 Insert

Half Clamp

14

Figure 1.0 (AZ-EL Mount with M8 Insert and Set Screw)

Advertising
This manual is related to the following products:

123