AXIS Q7900 Rack (FrontView)

Install the hardware

General placement requirements

The location of the AXIS Q7900 must meet the following requirements:

• Ambient temperature: 0° to +45°C (32° to 113°F)
• Relative humidity: 20-80%
• Power source within 1.8 meters
• There must be a minimum of 5cm free space on the top, bottom, front and rear of the AXIS

Q7900 to ensure adequate ventilation

• No excessive dust

Placement requirements for installation in a 19” equipment rack

When mounting the AXIS Q7900 in an equipment rack, never stack other units directly on top - the
mounting brackets are not designed to support more than 1 unit.

• Pozidriv screwdriver #1
• Pozidriv screwdriver #3
• The AXIS Q7900 must be grounded to the same ground as the equipment rack.
• The equipment rack must be braced and bolted to the floor.

AXIS Q7900 Rack

ACTIVITY

LOOP

NETWORK

1

2

3

4

PS1

PS 2

FANS

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWER

1

2

3

4

5

6

POWER

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWE R

1

2

3

4

5

6

POWER

1

2

3

4

5

6

Power supply 2

Network Activity &

Loop LEDs 1-4

AXIS Video

Encoder Blades

Slot 1

Slot 14

Power supply 1

PS 1-2 &

Fan LEDs

Fans button

Advertising