Installation – Bradley Smoker E19-310DC User Manual

Page 3

Advertising
background image

3

Installation

E19-310DC

Bradley Corporation • 215-163DCE Rev. A; ECN 08-512

9/11/08

Installation

Supplies Required:

• (3) M10 floor anchors and bolts
• Teflon tape and pipe sealant
• Piping to 1-1/4" BSP water supply inlet and 1-1/4"

BSP drain outlet on unit

• Adequate supply pipe supports
• Minimum 102mm (4") drain to accommodate 115 liters

(30 gallons) per minute discharge for shower waste

• OPTIONAL: sign-mounting hardware

NOTE: Local codes may require the installation
of a backfl ow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly. Backfl ow
prevention valves are not included with the fi xture and
may be supplied by the contractor or purchased from
Bradley Corporation.

Step 1: Secure base to floor

1. Install three suitable anchors (supplied by installer)

for M10 bolts in the floor.

2. Bolt the base to the floor anchors using M10 bolts

(supplied by installer).

Step 2: Assemble components

1. Assemble the remaining unit components as

shown on page 4.

• Apply pipe sealant (by installer) to all male-

threaded pipe joints.

• Use the rubber grip pad provided or a strap

wrench around pipes when tightening to prevent
marring. Place the grip pad on the pipe, then
put the wrench over the grip pad and turn the
pipe with the wrench.

• Bottom edge of the showerhead should be

2159mm (7'-1") from the floor.

Step 3: Connect water supply

IMPORTANT: Do not rely on Bradley’s
Combination Unit to support supply piping.

1. Connect water supply piping to 1-1/4" BSP inlet

on unit (piping by installer). Provide adequate
supports (by installer) for supply pipe using pipe
hangers or other means.

2. Connect drain piping to 1-1/4" BSP drain outlet on

unit (piping by installer).

3. Hang the safety sign from the unit with the curtain

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

Top View From Bowl

114mm
(4-1/2")

Ø 78.7mm

(3.1")

NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/- 3mm (1/8") per threaded joint. To fi nd the tolerance
of a dimension, add the number of thread joints in
between a dimension and multiply it by 3mm (1/8").

645mm

(25-3/8")

610mm

(24")

2159mm

(7'-1")

to

Floor

1676mm

(66")

to

Floor

140mm
(5-1/2")

1041mm

(41")

152mm

(6")

247mm
(9-3/4")

Ø 273mm

(10-3/4")

267mm

(10-1/2")

Ø 229mm (9") Flange

with (3) Ø 10mm
(3/8") Holes on Ø

203mm (8") Bolt Circle

229mm

(9")

Advertising