3 unpacking and installing the hardware, Unpacking and installing the hardware, 3unpacking and installing the hardware – Bosch DSDA ISCSI DISK ARRAY SERIES DSA-S5B50 User Manual

Page 8

Advertising
background image

6

en | Unpacking and Installing the Hardware

DSDA iSCSI Disk Array Series

V 1 | 2008.08

Installation Guide

Bosch Security Systems

3

Unpacking and Installing the Hardware

1.

Unpack your system by opening the packing box and lifting the outer shipping box off the

pallet.

2.

Install the appropriate rack mount for your installation and system using the Rack

Installation flyer in the rail kit box for reference.

3.

Install the appropriate rack mount for any disk shelves that will be connected to the

system

4.

With two people, lift the system into the rack or system cabinet, and secure it to the rack

uprights. The system weighs slightly over 30 kg (67 lb) and requires one person at the

end of the system to guide it into the rail ends.

5.

For installation and wiring of additional disk shelves, see Section 6 Adding Storage,

page 17.

6.

Connect the power cords, making sure that the power supplies are connected to

separate AC power sources. This ensures redundant power sources.

Make sure to set the power cable retention clips properly.

Ensure that power supply LEDs are lit.

i

NOTICE!

For more detailed information on the hardware installation please refer to the documentation

available on www.boschsecurity.com under Product Catalog > CCTV > IP Video > Disk

Arrays.

!

WARNING!

The storage system is heavy. Two people are required to lift a system.

!

CAUTION!

Only use the rail kit supplied with the system. Using a different rail kit can cause injury to you

or damage to your system.

Advertising
This manual is related to the following products: