Prepare support frame, cont’d, Prepare the hood – Broan ELITE E54000 User Manual

Page 10

Advertising
background image

- 10 -

MOUNTING SCREWS

(3.9x9.5mm)

SUPPORT
FRAME

BRACKET

FRONT

SUPPORT

FRAME

FIG. 9

PREPARE SUPPORT
FRAME, cont’d.

7. Hang the support frame from the support

frame bracket (located on ceiling).

Securely fasten with (4) 3.9x9.5mm

mounting screws. Fig. 9.

PREPARE THE HOOD

DUCTED AND NON-DUCTED HOODS

1. Assemble the Electrical Mounting Plate to

the hood with (2) 3.9x9.5mm mounting

screws and (2) serrated washers. Fig. 10.

DUCTED HOODS ONLY

2. Install the plastic discharge collar into the

opening of the blower discharge. Fig. 11.

3. Install 6” diameter metal duct over the

blower discharge. It must be long enough

to reach ducting that discharges to the

outside. Duct tape all joints to make them

secure and air tight.

NON-DUCTED HOODS ONLY

Note: the following material must be

purchased separately for non-ducted

recirculation installations:

Non- Ducted Recirculation Kit RK54

1. Discard the plastic discharge collar

supplied with the hood. Install the 5” to 6”

adapter (supplied with the non-ducted

recirculation kit) over the blower

discharge. Fig. 12.

2. Duct tape alljoints to make them secure

and air tight.

ELECTRICAL

MOUNTING PLATE

MOUNTING

SCREWS

(3.9x9.5mm)

FIG.10

FIG.11

DISCHARGE

COLLAR

DUCTED

ONLY

FIG.12

6”/5”

ADAPTER

NON-DUCTED

ONLY

Advertising