Quick setup list – Briggs & Stratton 5900692 User Manual
Page 2
S200X 25HP & 27HP - 61” Mower Deck
TP 300-7333-02-M2-SP
7/2007
2
Quick Setup List -
Page
Setup Procedure
Steps to Perform
3
Uncrating
❏ Remove Crate & Banding.
❏ Loosen Hydraulic Release Valves.
❏ Release Parking Brake and Roll Tractor forward off skid.
❏ Tighten Hydraulic Release Valves.
3
Battery Installation
❏ Install Battery.
4
Tractor Assembly
❏ Assemble the Motion Control Handles.
❏ Assemble the Seat.
5
Roll Bar Assembly
❏ Install the Roll Bar.
6
Check Fluid Levels
❏ Check Engine Oil level.
❏ Check Hydraulic Oil level.
❏ Check Tire Pressure
7
Mower Assembly
❏ Check Blade Bolt Torque.
❏ Install Deck Pusher Bars (72” Models).
❏ Install the Mower Deck (72” Models).
❏ Check & Adjust Deck Lift Rod Timing.
❏ Check & Level Mower Deck.
❏ Check Deck Drive Belt.
12
Lubrication &
❏ Lubricate all grease & oil points.
Fuel Preparation
❏ Add fuel.
❏ Start the Engine.
14
SAFETY CHECKS
❏ Check for LOOSE HARDWARE.
❏ Check all OPERATOR CONTROLS.
❏ Perform SAFETY INTERLOCK SYSTEM CHECK.