Liebherr rail mounted gantry crane, Lifting capacity working speeds, Diagnostic & management system options – Liebherr Rail mounted stacking cranes (RMG) User Manual

Page 4

Advertising
background image

Liebherr Container Cranes Ltd.

Fossa, Killarney, Ireland

Tel.: +353 64 6670200, Fax: +353 64 6631602

www.liebherr.com, E-Mail: [email protected]

R

M

G

0

7/

20

13

S

ub

je

ct

to

c

ha

ng

e

w

ith

ou

t n

ot

ic

e

Liebherr Reeving System: Sway Prevention, NOT Sway Correction
Regeneration During Lowering of Load and Drive Deceleration

Results in Overall Reduction in Power Consumption

Stable, Rigid, High Quality Steel Structure Design

Accurate and Faster Stacking
Ideal for Automation

Separate Drives for Hoist, Trolley, Travel and Slewing (If Installed)

Allowing Superior Fine Positioning
Simultaneous Motion
No Need for Side Shift on Spreader

Liebherr Drive Systems
Worldwide Liebherr Service Network
Extensive Training (In - House & On - Site Following Commissioning)
Purpose Built State-of-the-Art Design & Production Facilities Located in Ireland Since 1958
Highly Skilled & Experienced Employees (Expertise In House - For After Sales Service)

Responsibility with Liebherr (Eliminating Interface and Compatibility Problems)

(i.e. Structural, Mechanical and Electrical Design, Production, Commissioning and Service)

t

fi

L

e

l

g

n

i

S

40.6t - 50t

Twin Lift (optional)

50t - 65t

Hoisting with No Load

52m/min - 80m/min

Hoisting with Rated Load

23m/min - 40m/min

Trolley Travel (with & without load)

Up to 180m/min

Gantry Travel (without load)

Up to 240m/min

Slewing ±190°(Optional)

1.2 r.p.m.

* Higher Speeds Also Available on Request.

- Rotating Machinery Trolley

- Interface with TOS (Terminal Operating System)

- Trim and Skew Spreader Positioning

- Energy Chain / Festoon System

- Non Contact Anti-Collision System

- Automation of RMG and Container Tracking

- Container Positioning System

- Remote Operation Optional

- Fault Data Between Crane & Office by RF Link/Fibre Optic with

Optional Link to Liebherr Factory.

Lifting Capacity

Working Speeds*

Supplier

Liebherr

Operating System

Windows

Logic Control System

CoDeSys

Description:

- Status of Switchgear and External Electrical Components

- Storage Capacity of Faults (Up to 20,000)

- User-Friendly Interface with Easy To-Use Colourful Screens

- Independence of Crane Logic System, Therefore NOT Interfering

with Crane Control in Event of Self-Failure.

- Includes Trending & Tables for Production Data and Drive Data

Summary of Main System Features:

- General Control Overview

- Crane ON Status

- Individual Drive ON Screens (One for Each Drive)

- Detailed Drive Data (Motor Current, Voltage, Speed)

- Wind Speed & History

- Spreader Status

- Fault Stack

- Load Statistics

- Maintenance

Diagnostic & Management System

Options

Liebherr Rail Mounted Gantry Crane

Advertising