Bunn TU3Q User Manual

Page 17

Advertising
background image

Page 17

SERVICE (cont.)
DIGITAL BREW TIMER (Late Models)

FIG. 6 DIGITAL BREW TIMER

P2200.50

Location:

The timer is located inside the hood, on the left

side.

Test Procedure.
NOTE: Do not remove or install wires while timer
board is installed. Pressure applied to one side may
cause damage to the board.
1. Disconnect the brewer from the power source and

remove the top cover.

2. Remove the two #8-32 screws securing circuit

board to the mounting bracket.

3. Remove circuit board and spacers (as required).
4. With a voltmeter, check the voltage across termi-

nals TL1 and TL2 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source. The indication must be:
a) 120 volts ac for two wire 120 volt models
b) 230 volts ac for two wire 230 volt models.
c) 100 volts ac for two wire 100 volt models.

5. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #6.
If voltage is not present as described, refer to the
Wiring Diagrams and check the brewer wiring har-
ness.

6. With a voltmeter, check the voltage across termi-

nals TL1 and TL4 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source. The indication must be 0 volts.

If voltage is as described, proceed to #7.
If voltage is not as described, disconnect the brewer
from the power source and replace the timer.

7. With a voltmeter, check the voltage across termi-

nals TL1 and TL4 when the "ON/OFF" switch is in
the "ON" position. Connect the brewer to the power
source and press the "START" switch. The indica-
tion must be as follows:
a) 120 volts ac for two wire 120 volt models.
b) 230 volts ac on two wire 230 volt models.
c) 100 volts ac for two wire 100 volt models.

If voltage is present as described, the brew timer is
operating properly. Reset the timer as required, to
obtain the desired brew volume.
If voltage is not present as described, disconnect the
brewer from the power source and replace the timer.

Removal and Replacement:
1. Remove the two #8-32 screws securing circuit

board to the mounting bracket.

2. Remove circuit board and spacers (as required).
3. Remove all wires from the timer.
4. Attach all wires to the replacement timer board

prior to installation to the component mounting
bracket. Refer to FIG. 7 when reconnecting the
wires.

5. Install new circuit board with spacers (as re-

quired) to the hood.

6. Adjust the timer as described below.

Timer Setting:
NOTE: Prior to setting or modifying volumes, check
that the brewer is connected to water supply, the tank
is properly filled, and a funnel and server are in place.
NOTE: All volume settings must be done with the
sprayhead installed.

1. Modifying brew volumes. To modify a brew vol-
ume, first check that the SET/LOCK switch is in the
“SET” position on the circuit board.

10288 071000

Advertising