Dealer preparation check list – Bush Hog BBC 48 User Manual

Page 5

Advertising
background image

DEALER PREPARATION CHECK LIST

BOX BLADES

BEFORE DELIVERING MACHINE — The following check list should be completed.

Use the Operator’s Manual as a guide.

r

1. Assembly completed.

r

2. All fasteners torqued to specifications given in Torque Chart.

r

3. All decals in place and readable. (See decal page.)

r

4. Overall condition good (i.e. paint, welds)

r

5. Operators manual has been delivered to owner and he has been instructed on the

safe and proper use of the implement.

Dealer’s Signature

THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

3

Advertising
This manual is related to the following products: