Bunn Dual TF User Manual

Page 26

Advertising
background image

Page 26

Location:

The level control board is located inside the

front of the brewer just left of center on the component
bracket

Test Procedure:
1. Disconnect the brewer from the power source.
2. Remove the violet wire from terminal 1 & pink wire

from terminal 4 of the circuit board.

3. Check the voltage across terminals 2 & 3 with a

voltmeter. Connect the brewer to the power source.
The indication must be:

a.) 120 volts ac for three wire 120/208 volt mod-

els and three wire 120/240 volt models.

b.) 200 to 240 volts ac for two wire 200 or 240 volt

models.

4. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the
wiring diagrams and check the brewer wiring harness.
5. Reconnect the violet wire to terminal 1.

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE
(Electro/mechanical only)

6. Carefully connect a piece of insulated jumper wire

to terminal 4. Keep the other end of this wire away
from any metal surface of the brewer.

7. Check the voltage across terminals 1 & 3 with a

voltmeter. Connect the brewer to the power source.
The indication must be:

a.) 120 volts ac for three wire 120/208 volt mod-

els and three wire 120/240 volt models after a
delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt

models after a delay of approximately 1 sec-
ond.

8. Touch the free end of jumper wire to the brewer

housing. The indication must be 0.

9. Move the jumper wire away from the brewer

housing. The indication must again be:

a.) 120 volts ac for three wire 120/208 volt mod-

els and three wire 120/240 volt models after a
delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt

models after a delay of approximately 1 sec-
ond.

10. Disconnect the brewer from the power source and

remove the jumper wire from terminal 4.

If voltage is present as described, the level control
board is operating properly, proceed to #11.
If voltage is not present as described, replace the level
control board.

11. Reconnect the pink wire to terminal 4.
12. Gently pull the probe out of the tank lid and inspect

for corrosion. Replace it if necessary.

13. Place the probe so that neither end is in contact

with any metal surface of the brewer.

14. Check the voltage across terminals 1 & 3 with a

voltmeter. Connect the brewer to the power source.
The indication must be:

a.) 120 volts ac for three wire 120/208 volt mod-

els and three wire 120/240 volt models after a
delay of approximately 1 second.

b.) 200 to 240 volts ac for two wire 200 or 240 volt

models after a delay of approximately 1 sec-
ond.

15. Move the probe's flat end to the brewer housing.

The indication must be 0.

16. Move the probe's flat end away from the brewer

housing. The indication should again be

a.) 120 volts ac for three wire 120/208 volt mod-

P978

.

MI

NU

TE

S

BU

NN

-O

-M

AT

IC

P/

N

26

20

-

12

0 V

AC

.

MI

NU

TE

S

BU

NN

-O

-M

AT

IC

P/

N

26

20

-

12

0 V

AC

2

2

2

1.5

1.5

1

1

1

.5

.5

2.5

2.5

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

P/

N

24

48

6-0

00

0

12

0 V

AC

P/N 24486-0000 120 VAC

BU

NN

-O

-M

AT

IC

BUNN-O-MATIC

3

3

3

4

4

5

5

6

6

7

8

2

2

2

1.5

1.5

1

1

1

.5

.5

2.5

2.5

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

MI

NU

TE

S

MINUTES

P/

N

24

48

6-0

00

0

12

0 V

AC

P/N 24486-0000 120 VAC

BU

NN

-O

-M

AT

IC

BUN

N-O-MATIC

3

3

3

4

4

5

5

6

6

7

8

ST

AR

T

ON

/ W

AR

ME

R

SE

LE

CT

OR

RE

AD

Y

RE

AD

Y

ON

/ W

AR

ME

R

ST

AR

T

1

1⁄2

gal

1 g

al

1⁄2

ga

l

SE

LE

CT

OR

1

1⁄2

ga

l

1 g

al

1⁄2

ga

l

Advertising